Skip to the content
Blog
Testimonials
Commercial Customers
AEI
Home
About Us
Solar PV
Solar Panel Cost Ireland
Solar PV Explained
AEI Completed Jobs
Solar Panel Installation
Solar PV for Farms
FAQ
Heat Pumps
Home Heating
Cost Calculator
Gas Condensing Boilers
Oil Condensing Boilers
Heat Pump Upgrade
Power Flushing & Cleaning
Central Heating Controls
Oil Boiler Government Grants
FAQ’s
Solar Hot Water
Installation Cost
Solar Hot Water Explained
Domestic Solar Hot Water Cylinders
Solar Panel Government Grants
AEI Completed Jobs
Solar Panel Installation
Solar Hot Water Heating System Faq
Service & Maintenance
Heat Recovery Ventilation
HRV Installation Cost
HRV Explained
Retrofit & Ductless Ventilation
Heat Recovery Ventilation FAQs
Blog
New Builds
Part L and BER Certs
Heat Pumps for New Homes
New Builds Explained
Underfloor Heating
Heat Recovery Ventilation
Central Heating Controls
Testimonials
Commercial Customers
Contact Us
Commissioning
Home
»
Commissioning
Commissioning
Commissioning Form 2022
Commissioning Engineer:
*
Date
DD slash MM slash YYYY
Customer Name:
*
Customer Address:
*
Comments:
Is this a
Service
Full Installation
Collector Type:
*
Panel level and centred on a south facing roof?
Yes
No
Small hole made for pipes and sealed at roof flashing?
Yes
No
Electrical works meet SEAI standards?
Yes
No
All pipework supported at 1m intervals?
Yes
No
Flexi solar pipe fixed to wall beside cylinder to prevent movement?
Yes
No
Scaffolding errected in accordance with current regulations and scaftags visible?
Yes
No
Solar loop flushed and free of air?
Yes
No
Expansion vessel installed with water inlet at the top?
Yes
No
Expansion Vessel Pressure:
*
System flushed for 15 mins and left at 2 bar?
Yes
No
Solar leak seal used?
Yes
No
All flexi nuts tightened with no leaks after flushing?
Yes
No
100% of pipework covered with insulation?
Yes
No
What flowrate was set on the pump station? (1 litre per 10 tubes or 1m²). Read from bottom of float!
*
Cylinder max temperature set to 60°c?
Yes
No
Customer clearly shown how to read the system? This should take 5 minutes?
Yes
No
All paperwork left with the customer?
Yes
No
Pump station valves returned to the correct position?
Yes
No
All rubbish removed and separated for recycling?
Yes
No
All work areas left cleaner than when we arrived?
Yes
No
CAPTCHA